Project Overview
The design of this 70,000 sf, single story brick structure locates the gym/multipurpose room, kitchen and administrative areas on one side of the main corridor, permitting after hours public use. Accommodating 450 students, nearly all of the school’s 20 classrooms are positioned at the building’s perimeter and receive natural light.